Transformer substation Plzeň TR – HTR – New 110kV transformer substation

Reconstruction of the existing transformer station and construction of new transformer stands. Building site 011 – Connection of TR 110 kV cables; Building site 200 – Demolition; Building site 310 – Removal of topsoil; Building site 311 – Hard landscaping; Building site 320 – Outside fencing; Building site 321 – Operations’ fencing; Building site 322 – Security fencing; Building site 330 – Final landscaping; Building site 350 – Earthworks for cables; Building site 353 – Earthworks for earthing; Building site 360 – Rainwater drainage; Building site 511.1 – Covered transformer stands; Building site 520 – Common area building and HV substation; Building site 527 – Cable ducts and conduits; Building site 690 – Indoor road