Transformer substation Milín – Modernisation of sewage drainage
Construction and installation work took place aimed at modernisation of the collection system and sewage drainage within the TR Milín premises. Additionally, pipelines were rehabilitated using the trenchless UV-liner method, pits were rehabilitated and PVC piping and pits were replaced using the trench method.