TR Uherský Brod – Water, flood measures, drainage

Modifications were carried out within the substation premises at Uherský Brod. The overall objective was to limit damage caused by flooding of the area with water and mud that flow in from the surrounding land during heavy rains. The works ranged from finding and marking out the existing engineering networks, demolishing surfaces, construction of buildings, laying down bitumen, carrying out final landscaping and the required tests and technical audits. Work included construction of rainwater drainage, modifications to the drainage ditches, reconstruction of the pumping station, LV lines to the pumping station, water pipeline, sludge pits, modifications to fencing part 1 and 2 and operations’ fencing.