Remedial works at agglomeration site within Vítkovice a.s. grounds

Demolition of 42 buildings complex and a 100-m high sintering plant chimney, removal of hazardous waste, crushing of reinforced concrete rubble and other related activities. Demolition was fully carried out down to the level of -3.0 m. The material was further crushed on the construction site and used for backfilling. The whole area was covered with remedial overlay of “industry” and “forest”, followed by the planting of woody plants.