General repair of coarse grinding mill building and anchor points

This contract included full remediation of the reinforced concrete structures in accordance with the prescribed procedures including blasting and painting of steel structures throughout the whole building. Scaffolding was assembled and then dismantled for these works. New collective safety features were installed on the roof for potential work in future. In conjunction with the work, the reconstruction of the crane tracks was also carried out together with laying of new cables from the switch room and new system for attaching power supply and control cables to the crane tracks.