Repair of roof’s ceiling steel structures and anchor points at sorting plant building
Remediation of reinforced concrete constructions and modification of steel structures was carried out; metal fittings and parts, and tinsmith features. All works, including blasting of structures and subsequent repairs, took place from the scaffolding. Dismantling the existing crane and crane tracks. Supply and installation of the crane and crane track was carried out. Installation of approved catchment system on the roof, removing the existing glazing and fitting wire glass in its place