Gasholder demolition, processing and sale of scrap metal

Demolition of the mixing station building, filters, and roads in the gasholder vicinity. Demolition of the wet-type gasholder with collaboration of height workers and using machinery, together with demolition of the base slab was also carried out. Processing of scrap metal to transport dimensions by hot cutting and machines. Foundations in all of the buildings were demolished down to the level of -2.0 m below ground. Backfilling with crushed demolished material took place. Surplus material was transported to a controlled landfill.