Extending the water pipeline Třinec – Nebory – Dušinec

Construction of water pipelines at Nebory and Dušinec were carried out, namely excavation of trenches, laying of pipelines and backfilling with compaction as well as laying bitumen. Construction of new measuring and inspection pit took place. Following excavation of trenches, piping of various sizes leading from the main waterworks was laid. After backfilling, asphalting of damaged roads was carried out. Part of the water pipeline system was the construction of new concrete measuring and inspection pit at the waterworks. Finally, landscaping of the affected plots was carried out.