Demolition of 100m R207 chimney

Demolition of 100 m monolithic reinforced concrete chimney fitted with internal ceramic flue and thermal insulation. Part of the work included the removal and disposal of waste and subsequent backfilling with soil to the level of the surrounding terrain. Prior to starting the demolition work, the piping and cabling bridge located in close vicinity of the chimney was protected from any potential damage.