Repair of reinforced concrete structures at loading storage facility

Repair of glazing – south wall, east wall. Removal and installation of the glazing structure was carried out. Steel parts, windowsill metal sheets and glazing were replaced. Cleaning of the openings’ edges of each window section was carried out. The window rod opening system was refurbished. All painting of steel structures was carried out by using the Hempel system – prime and top coats. Full ecological disposal of construction waste was carried out.