Reconstruction of Warehouse No. 3 floor at Mělník Power Plant

Demolition of the existing floor, levelling and cleaning the foundation concrete, carrying out new waterproofing and concreting of the new reinforced concrete floor with expansion joints were carried out. Part of the contract also included rehabilitation of the existing service ramp, blasting, injection of cracks, re-profiling and final painting.