Krasíkov, 400/100 kV transformer station – Repairs and painting

Painting of the main steel structure and auxiliary steel structure was carried out. Access road was constructed. Overhaul of encapsulated wires/cables, reconstruction of the roof sheathing and Building C facade and installation of lightning conductor were carried out.