Earthworks – Column foundations

Carrying out hard landscaping, preparation of piling platform and the subsequent construction of cast-in-situ piles also took place. Subsequently, final landscaping and removal of excess soil to the landfill was carried out. As part of the addition, rebars for the reinforced concrete structure were installed at the tunnel site, followed by restoration of paved and grassy areas to their original condition.