Trmice Heating Plant – WWTP pumps and building refurbishment

Temporary relocation of technology, demolition of the building and dismantling of existing screw pumps was carried out. After extensive rehabilitation work on concrete structures, the construction of steel structures, new cladding, catchment system including one on the building roof, infilling of openings including sectional doors and cast floors took place. Following the supply and installation of completely new technology, electrical and technological distribution systems and setting the remote control from the Trmice Heating Plant control room, comprehensive tests and required technical audits were carried out. In the subsequent WWTP trial mode, minor changes as per the operation requirements were conducted.